Black Week: 40% off your first year of ProUntil November 30 See pricing
PricingAffiliates

v8.1.0 - Tasks: priorities, categories, filters, sub-tasks; Todoist and Toggl; campaign attribution

PV0T Team

Tasks

  • Priorities: high / medium / low on any task, shown as a coloured ring. Set by typing p1–p3 or !high, from Add task, or from the task menu. Untimed tasks sort by priority.
  • Categories: quick tasks can take an existing item category, typed as #name or picked from the menu.
  • Filters: Priority and Category chips on Unplanned, Today and Upcoming, remembered per view in the browser.
  • Sub-tasks: one level, built on the Library's item nesting. Add from the task menu; tick, rename, start a timer on, or remove each one. Rows show a done/total count and can be collapsed.
  • Save to Library: any quick task, open or completed, can be turned into a reusable Library item, bringing its sub-tasks along.
  • Ticking a running task now finishes its timer and saves the tracked time, instead of leaving a done task still counting.

Typed dates in more languages

  • Day, time and length in a task name are now understood in German, French, Italian, Portuguese, Dutch, Polish, Turkish, Indonesian, Vietnamese and Russian, alongside English and Spanish.
  • Each of those languages gets its own example placeholder in Add task.

Integrations

  • Todoist (OAuth): import open tasks with due date, time, priority and length; a project maps to the category of the same name. Re-importing only adds new tasks. Completing an imported task completes it in Todoist (optional).
  • Toggl Track (API token): import the last ~3 months of time entries into Insights; send each finished timer to Toggl as a time entry tagged PV0T (optional).